天美传媒麻豆mdxxxx-天美传媒免费-天美传媒免费观看一二三在线-天美传媒免费全集观看-天美传媒免费网站入口-天美传媒入口曝光

Shanghai Industrial Boiler Co., Ltd./Shanghai industrial boiler (Wuxi) Co., Ltd.
Solution·Application area
Glass industry
The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.

2018/08/16 14:44:43

16618

Prev Next
×
主站蜘蛛池模板: 国产成人精品一区二区视频免费 | 国产又黄又刺激的A片小说 国产又黄又刺激的免费A片小说 | 国产亚洲精品久久7788 | 丁香花在线观看免费观看 | 97制片厂爱豆传媒 | 欧美高清视频看片在线观看 | 成人精品一区二区久久久 | 99热这里只有精品免费国产 | 成人午夜爽A片免费视频 | www视频免费在线观看 | 国产美女精品一区二区三 | 久久人人槡人妻人人玩夜色AV | 久久午夜伦理 | 肉蒲团从国内封禁到日本成经典 | 四虎影视8848a四虎在线播放 | 天堂网天堂手机版 | 麻豆国产精品一级无码 | 国产乱伦人妻一区二区三区四区 | 波多久久夜色精品国产 | 欧美性受bbb | yy啪啪啪视频 | 无套内谢的新婚少妇国语播放 | 日韩一卡2卡三卡4卡无卡网站 | 十八禁啪漫动漫在线看 | 欧美性生交大片免费看A片 欧美性生交活XXXXXDDDD | ts人妖在线| 国产免费九九久久精品一区 | 天天草夜夜草 天天日导航 天天草综合 | 色综合网天天干 | 只有这里有精品99 | 五十六十熟女猛烈交尾A片一 | 国产精品视频一区二区三区不卡 | 永久免费看MV网站入口亚洲 | 日韩人妻无码精品一专区二区三区 | 国产成人91色精品免费看片 | 中文字幕亚洲男人的天堂网络 | 亚洲精品久久久久久久久久久 | 国产成人精品午夜一区 | 国产黄A片免费网站免费 | 国产日韩精品一区二区在线观 | 婷婷六月激情 |