天美传媒麻豆mdxxxx-天美传媒免费-天美传媒免费观看一二三在线-天美传媒免费全集观看-天美传媒免费网站入口-天美传媒入口曝光

Shanghai Industrial Boiler Co., Ltd./Shanghai industrial boiler (Wuxi) Co., Ltd.
Solution
Application area

Shanghai industrial boilers provide a one to one solution for different industry attributes and needs of customer enterprises.



Engineering generalcontractor

Shanghai industrial boiler is also committed to providing customers with energy conservation and environmental protection boiler project package solution.

Power station boiler EPC package
Shanxi Gaoyi Iron and Steel Co., Ltd. 15MW high temperature and extra high pressure gas power generation project
Unit operation mode:

A 190t/h high-temperature ultra-high pressure gas boiler (blast furnace gas mixed with converter gas) +1 15MW high-temperature ultra-high pressure back pressure steam turbine unit, steam turbine back pressure parameters: 3.9MPa (a), ~ 373 °C. The back pressure of the steam turbine is returned to the boiler reheater, and the steam temperature is raised to 450 ° C and sent to the steam blower of the steel mill.

Fuel fuel:Mixed gas of blast furnace gas and converter gas
Ignition method:Liquefied gas ignition

In principle, the boiler operates at base load, but has variable load peaking capability. The boiler has good adaptability to the sliding pressure operation and the constant pressure operation.

The time from ignition to full load of the boiler meets the following requirements under normal starting conditions:

Cold start (stop more than 72h)6~8 hours

Warm start (stop 10-72h)3~4 hours

Hot start (within 10 hours of shutdown)1.5~2 hours

Temperature adjustment method:The superheated steam is cooled by two-stage water spray; the reheated steam is cooled by a small amount of water spray.

The service life of the boiler is 30 years, and the life of the convective heating surface flushed by the smoke is more than 120,000 hours. The overhaul interval is 5 years.

The project has been put into operation according to the installation, and all the indicators have reached the predetermined requirements.



Boiler modification

Shanghai industrial boilers can be retrofitted by assembling a Seiko retrofitting team, which can be customized according to customer requirements according to local conditions.

With the continuous improvement of national energy policy and environmental protection requirements, Shanghai Industrial Boiler Co., Ltd. and Shanghai Industrial Boiler (Wuxi) Co., Ltd. have carried out in-depth research and development on the transformation of coal-fired boilers.

Shanghai Industrial Boiler Co., Ltd. and Shanghai Industrial Boiler (Wuxi) Co., Ltd. are willing to customize various boiler renovation solutions for the majority of users.
In order to improve the performance of the original boiler and reduce the emission concentration of the boiler, for the country's energy-saving and environmental protection cause to make due contributions.


Equipment installation

The quality of the engineering installation directly determines its effect after being put into use.

×
主站蜘蛛池模板: 亚洲国产熟妇无码一区二区69 | 欧美精品国产综合一区二区三 | 国产中文字幕亚洲一区二区三区 | 极品少妇被后入内 | 国产精品成人一区二区三区视频 | 91久久精品一区二区三区 | 538亚洲欧美国产日韩在线精品 | 福利视频一区二区三区 | 成人精品电影推荐 | 欧美成人综合久久久 | 久9精品视频 | 天堂中文网在线 | 日本v在线观看 | 国产欧美精品区一区二区 | 嫩b人妻精品一区二区三区 嫩草AV久久伊人妇女 | 亚洲国产美女黄色视频 | 日本一区二区视频在线观看 | 日韩在线免费观看av网站 | 亚欧精品一区二区三区四区 | 四虎影视国产精品 | 国产精品乱偷伦免费视频免费观看 | 欧美精品v欧洲精品 | 久久精品一区二区三区 | 放荡乱h伦文粗大hhh高潮 | swag精品 | 欧洲成人免费视频 | 久久天天躁狠狠躁夜夜躁2024 | 岛国在线无码免费观 | 亚洲国产成人精品无码区密臀Av | 精品久久久久中文字幕人妻色诱 | 亚洲欧美日韩国产一区二区三区 | 色欲色香天天天综合网图片 | 欧美丰满熟妇BBB久久久 | 免费国产美女爽到喷出水来视频 | 精品国产乱码久久久久久 | 午夜亚洲国产日本电影一区二区三区 | 久久成人国产精品一区二区 | 九九在线观看精品视频6 | 国产真实乱对白精 | 开心激情久久 | 久久国产免费一区二区三区 |